Cement Mason / Concrete Finisher Prevailing Wage in Forrest County, Mississippi (2026)
The federal Davis‑Bacon prevailing wage for a Cement Mason / Concrete Finisher (Building construction) in Forrest County is $18.31 base + $0.00 fringe = $18.31 total per hour. Mississippi has no separate state prevailing-wage law, so the federal Davis-Bacon rate is the prevailing wage.
Rate table by construction type
| Construction type | Source | Base | Fringe | Total |
|---|---|---|---|---|
| Building | Federal · MS20260048 | $18.31 | $0.00 | $18.31 ⚑ |
| Heavy | Federal · MS20260063 | $17.75 | $0.00 | $17.75 ⚑ |
| Highway | Federal · MS20260131 | $11.54 | $1.63 | $13.17 ⚑ |
| Residential | Federal · MS20260039 | $9.87 | $0.00 | $9.87 ⚑ |
⚑ Green marks the governing (higher-of) rate. Each construction type is its own wage determination — the WD# is shown per row.
Source & freshness
- WD number
- MS20260048
- Modification
- #2
- Effective
- May 18, 2026
- Last verified
- Jul 14, 2026
Official source: SAM.gov wage determination MS20260048 → · How we source rates
Worked certified-payroll line
A Cement Mason / Concrete Finisher on this determination working 40 straight hours owes $732.40 in base wages plus $0.00 in fringe = $732.40 gross for the week (Building). Overtime pays 1.5× the base only; fringe stays flat per hour. Run your own numbers in the calculator.
Nearby & related
Cement Mason / Concrete Finisher in Adams Countyrate →Cement Mason / Concrete Finisher in Alcorn Countyrate →Cement Mason / Concrete Finisher in Amite Countyrate →Cement Mason / Concrete Finisher in Attala Countyrate →Cement Mason / Concrete Finisher in Benton Countyrate →Cement Mason / Concrete Finisher in Bolivar Countyrate →Cement Mason / Concrete Finisher in Calhoun Countyrate →Cement Mason / Concrete Finisher in Carroll Countyrate →Bricklayer in Forrest Countyrate →Carpenter in Forrest Countyrate →Electrician in Forrest Countyrate →Ironworker in Forrest Countyrate →
Verify the current wage determination on SAM.gov or with the DOL Wage and Hour Division before bidding or paying. This is a readable presentation of the official determination, not legal or tax advice.
Last verified: Jul 14, 2026 · Reviewed by: the Davis-Bacon Wage editorial team
Last verified: Jul 14, 2026 · Reviewed by: the Davis-Bacon Wage editorial team